FPEW Design of an Upgraded Data Acquisition Communication and Flood Forecasting System in the EN countries Authors Eastern Nile Technical Regional Office (ENTRO) Theme Flood and Drought Date Of Publication 2010 PDF File Attachment Size 19%20FPEW_FIN_Data_Acquisition_Communication_Flood_Forecasting.pdf1.52 MB 1.52 MB Read more
ENIDS, Pilot Study on Improving Water Use Efficiency and Productivity on Rahad Irrigation Scheme in Sudan Authors Eastern Nile Technical Regional Office (ENTRO) Theme Agriculture and Irrigation Date Of Publication 2010 PDF File Attachment Size SDN_PS_IWUEP_Final_Report.pdf5.24 MB 5.24 MB Read more
ENIDS, Pilot Study on Improving Water Use Efficiency and Productivity on Selected Small Scale Irrigation Schemes in Ethiopia Authors Eastern Nile Technical Regional Office (ENTRO) Theme Agriculture and Irrigation Date Of Publication 2010 PDF File Attachment Size ETH_PS_IWUEP_Final_Report.pdf2.99 MB 2.99 MB Read more
Annual Report, July 2009-June 2010 Authors ENTRO_NBI Date Of Publication 2010 PDF File Attachment Size 2 ENSAP Annual Report, July 2009-June 2010.pdf1.2 MB 1.2 MB Read more
Monitoring Strategy Annexes Authors NBI Secretariat Theme Institutional Frameworks Date Of Publication 2010 PDF File Attachment Size 18a_MonStrategy_Annexes.pdf546.62 KB 546.62 KB Read more
Monitoring Strategy Authors Nile-Secretariat Theme Institutional Frameworks Date Of Publication 2010 PDF File Attachment Size Monitoring Strategy for the Nile River Basin.pdf12.08 MB 12.08 MB Read more
NBI Data Sharing Procedures Authors NBI Secretariat Theme Institutional Frameworks Date Of Publication 2010 PDF File Attachment Size 4.1 Nile Basin Interim Procedures for Data and Information Sharing and Exchange.pdf1.7 MB 1.7 MB Read more
FPEW Flood Risk Mapping for Pilot Areas in Ethiopia Authors Eastern Nile Technical Regional Office (ENTRO) Theme Flood and Drought Date Of Publication 2010 PDF File Attachment Size 32%20ETH_FIN_Flood_Risk_Mapping.pdf8.68 MB 8.68 MB Read more
EN PTP, Phase II: Volume 2 Power Study Appendices Authors Eastern Nile Technical Regional Office (ENTRO) Theme Hydropower and Interconnection Date Of Publication 2010 PDF File Attachment Size Vol2_Power_Studies_Appendices.pdf6.07 MB 6.07 MB Read more
EN PTP, Phase I: Module 2, Market and Power Trade Assessment, Volume 1: Executive Summary Authors Eastern Nile Technical Regional Office (ENTRO) Theme Hydropower and Interconnection Date Of Publication 2010 PDF File Attachment Size M2_Vol1_Executive_Summary.pdf292.76 KB 292.76 KB Read more