Environmental and Social Impact Assessment ESIA and development of a Resettlement Policy Framework RPF for the proposed small multipurpose MAIRA Dam in the Sio-Malaba-Malakisi Sub-Basin Maira Dam final ESIA report
Study on the Interconnection of the Electricity Networks of the Nile Equatorial Lakes Countries Feasibility Report Volume 4A Burundi -Rwanda Interconnections Main Report
Etude D interconnexion des Reseaux Electriques des Pays des Lacs Equatoriaux du Nil Rapport de Faisabilite Volume 5 B Interconnexions Burundi-RDC- Rwanda et Augmentation de Tension Rapport D etude Environnemental et Social