Eastern Nile Technical Regional Office

Theme
Hydropower and Interconnection
Goals
Energy Security
Programs
Eastern Nile Subsidiary Action Program (ENSAP)
Ownerships
ENTRO Document

Files in this item

EN PTP, Phase I: Module 6, Coordinated Regional Investment Planning, Volume 3.1 Analysis of the Network Expansion, Egypt, Final Report and Appendix

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
Accessibility status
Open Access
Language
English
Type
Planning document
Abstract

Volume 3.1 (Analysis of Network Expansion in Egypt) of the Report of Module 6 (Coordinated Investment Planning) of Phase I of the Eastern Nile Power Trade Program Study, implemented by ENTRO from 2006 – 2008. It analyses the behaviour of the transmission system planned for 2015-16 (based on 2015 planning data), and Load Flow in normal, N-1 and in N-2 situations for the peak demand. Due to the number of reinforcements proposed around Cairo, the N-1 situations were analysed on the spine between High Dam and Cairo, where the interconnection is most likely to be connected.

Similar Documents

BAS MPWRDS, Integrated Water Resources Development and Management Plan

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
01 Jul 2017
Accessibility status
Open Access
Language
English
Document Types
Planning Document
Type
Plan or blueprint

Eastern Nile Reference Dam Safety Guidelines

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
25 Dec 2014
Accessibility status
Open Access
Language
English
Document Types
Planning Document
Type
Planning document

EN WSM, Project Delineation and Prioritization II, Main Report, Annex 4.2 Fincha'a

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
10 Dec 2012
Accessibility status
Open Access
Language
English
Document Types
Planning Document
Type
Planning document

EN WSM, Project Delineation and Prioritization II, Main Report, Annex 4.1 Chemoga

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
10 Dec 2012
Accessibility status
Open Access
Language
English
Document Types
Planning Document
Type
Planning document

EN WSM, Project Delineation and Prioritization II, Main Report, Annex 4.4 Jita

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
10 Dec 2012
Accessibility status
Open Access
Language
English
Document Types
Planning Document
Type
Planning document