Eastern Nile Technical Regional Office

Theme
Hydropower and Interconnection
Goals
Energy Security
Programs
Eastern Nile Subsidiary Action Program (ENSAP)
Ownerships
ENTRO Document

Files in this item

EN PTP, Phase I: Module 6, Coordinated Regional Investment Planning, Volume 3.2 Analysis of the Network Expansion, Ethiopia, Final Report and Appendix

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
Accessibility status
Open Access
Language
English
Type
Planning document
Abstract

Volume 3.2 (Analysis of Network Expansion in Ethiopia) of the Report of Module 6 (Coordinated Investment Planning) of Phase I of the Eastern Nile Power Trade Program Study, implemented by ENTRO from 2006 – 2008. It analyses the network expansion plans for Ethiopia for 2015 -2016, and the behaviour of the planned Ethiopian power system for the 2015-16 in steady state, with the 220 kV interconnection between with Ethiopia and Sudan, planned for 2009, but without the interconnection between Egypt and Sudan. Several load flow calculations were performed in normal and in contingency situations for the annual peak, and this analysis identified possible weak points of the future transmission system.

Similar Documents

BAS MPWRDS, Integrated Water Resources Development and Management Plan

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
01 Jul 2017
Accessibility status
Open Access
Language
English
Document Types
Planning Document
Type
Plan or blueprint

Eastern Nile Reference Dam Safety Guidelines

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
25 Dec 2014
Accessibility status
Open Access
Language
English
Document Types
Planning Document
Type
Planning document

EN WSM, Project Delineation and Prioritization II, Main Report, Annex 4.4 Jita

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
10 Dec 2012
Accessibility status
Open Access
Language
English
Document Types
Planning Document
Type
Planning document

EN WSM, Project Delineation and Prioritization II, Main Report

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
10 Dec 2012
Accessibility status
Open Access
Language
English
Document Types
Planning Document
Type
Planning document

EN WSM, Project Delineation and Prioritization II, Main Report, Annex 4.3 Jema

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
10 Dec 2012
Accessibility status
Open Access
Language
English
Document Types
Planning Document
Type
Planning document