Eastern Nile Technical Regional Office

Theme
Hydropower and Interconnection
Goals
Energy Security
Programs
Eastern Nile Subsidiary Action Program (ENSAP)
Ownerships
ENTRO Document

Files in this item

EN PTP, Phase II: Volume 3: Preparation of Specification

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
Accessibility status
Open Access
Language
English
Type
Studies
Abstract

Volume 3 of the Report of the Regional Power Interconnection Feasibility Study, which is Phase II of the Eastern Nile Power Trade Program. It contains reports from three study modules:
• M4: Technical Specification of the Interconnection, which includes (1) 500 400 kV AC Sub-Stations technical specifications (general description of the three substations (Mandaya, Kosti and Nag Hammadi) involved in the regional interconnection project); Guideline for a turn-key specification of a complete Static Var Compensator connected at the Kosti Substation; telecommunication, SCADA, metering; and (2) HVDC Main Equipment Description – of the two HVDC stations (Kosti and Nag Hammadi) involved in the regional interconnection project, detailing the main equipment of a HVDC station, typical HVDC losses, and a typical layout for Kosti (Sudan) and Nag Hammadi (Egypt) HVDC Stations.
• M5: Operation and Maintenance, containing the OM strategy for all interconnection infrastructures located in the three countries, in four sub-modules relating to the different equipment types involved by the regional interconnection project: (i) 400 and 500kV substations (including SVC); (ii) HVDC converter stations; (iii) Overhead Lines; and (iv) Control systems, SCADA and metering.
• M9: Training Report, detailing training activities before and during interconnector operation, with operational and maintenance guidelines for future operator management and staff, covering alternative current substations, static var compensator facility, direct current converting stations, physical transmission lines, control centres (main and back-up) equipment and system operation teams.

Similar Documents

Economic assessment of Lower Barowetland ecosystem services as an input for the development of wetland management plan

Authors
Dr. Dawit Woubishet Mulatu
Date Of Publication
20 Aug 2021
Accessibility status
Open Access
Language
English
Document Types
Study
Type
Appraisal Document

Economic assessment of Lower Barowetland ecosystem services as an input for the development of wetland management plan

Authors
Dr. Dawit Woubishet Mulatu
Date Of Publication
20 Aug 2021
Accessibility status
Open Access
Language
English
Document Types
Study
Type
Appraisal Document

JMP OSI: The One System Inventory, Vol I, Eastern Nile Sub-Basins Summary Information

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
01 Jul 2020
Accessibility status
Open Access
Language
English
Document Types
Study
Type
Studies

JMP OSI: The One System Inventory, Vol I, Eastern Nile Sub-Basins Summary Information

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
01 Jul 2020
Accessibility status
Open Access
Language
English
Document Types
Study
Type
Studies

EN WSM, International Training/study tour on Rainwater Harvesting to India

Authors
Eastern Nile Technical Regional Office (ENTRO)
Date Of Publication
08 Mar 2020
Accessibility status
Open Access
Language
English
Document Types
Study
Type
Studies