Abstract
Volume 2 (Annex A-E) of the Project Implementation Plan for a fast track Integrated Watershed Management Project for Gimera, Ribb and Gema catchments of Ethiopia, based on a 12-month study conducted in 2007. The IWMP is an integral part of the Tana Beles Integrated Water Resources Development Program in Ethiopia, supported by the World Bank. The Report is in 4 volumes: Volume 1 (Main Report); Volume 2 (Annex A-E); Volume 3 (Annex F); and Volume 4 (Annex G-K). Volume 1 contains: Annex A (Project Area Description); Annex B (Unit Cost Guidelines); Annex C (Project Cost Estimates); Annex D (Economic and Financial Analysis Table); and Annex E (Guidelines for Community Action Planning and Implementation).