Grand Ethiopian Renaissance Dam (GERD)

Millennium Dam

E.01.01 Energy Hydro Power Plant

Overview

Summary

The Grand Ethiopian Renaissance Dam is a major hydropower facility on the Blue Nile in Ethiopia. It is intended to expand national electricity supply and regional power exports through a large dam, reservoir, powerhouse and associated transmission infrastructure. The facility was officially inaugurated on 9 September 2025 and reached a reported maximum installed capacity of 5,150 MW.

Description

The Grand Ethiopian Renaissance Dam (GERD ) formerly known as the Millennium Dam and sometimes referred to as Hidase Dam, is a gravity dam on the Blue Nile River in Ethiopia currently under construction. It is in the Benishangul-Gumuz Region of Ethiopia, about 40 km east of the border with Sudan. At 6,000 MW, the dam will be the largest hydroelectric power plant in Africa when completed, as well as the 8th largest in the world. The reservoir at 72 billion cubic meters will be one of the continent's largest. According to the Ethiopian government, as of June 2017, the Dam is 60% complete.

Objectives

àmajor benefit of the dam will be hydropower production. The electricity to be produced by the hydropower plant is to be sold in Ethiopia and to neighboring countries including Sudan and possibly Egypt. Selling the electricity from the dam would require the construction of massive transmission lines to major consumption centers such as Ethiopia's capital Addis Ababa and Sudan's capital Khartoum, both located more than 400 km away from the dam.

The Grand Ethiopian Renaissance Dam(GERD ) formerly known as theMillennium Dam and sometimes referredto as Hidase Dam, is a gravity dam onthe Blue Nile River in Ethiopiacurrently under construction. It isin the Benishangul-Gumuz Region ofEthiopia, about 40 km east of theborder with Sudan. At 6,000 MW, thedam will be the largest hydroelectricpower plant in Africa when completed,as well as the 8th largest in theworld. The reservoir at 72 billioncubic meters will be one of thecontinent's largest. According to theEthiopian government, as of June2017, the Dam is 60% complete.

Risks

  • Environmental Risks: Not Reported Social Risks: Not Reported Socio-Enviro Classification: Not Reported Other External Risks: Not Reported

Progress history

  • 2025 Operation planned: Data Not Available
    On 9 September 2025, Ethiopia officially inaugurated the Grand Ethiopian Renaissance Dam. The plant had reached its reported maximum installed capacity of 5,150 MW, supporting correction of the project stage from Construction to Operation. [Assessment date: 2025-12-31 | Evidence period: 9 September 2025 | Progress source(s): https://www.reuters.com/sustainability/boards-policy-regulation/ethiopia-opens-africas-largest-hydroelectric-dam-egyptian-protest-2025-09-09/ ; https://www.eep.com.et/?news=the-inauguration-of-the-grand-ethiopian-renaissance-dam-gerd-on-september-9-2025-marks-a-monumental-day-not-just-for-ethiopia-but-for-the-entire-african-continent ; https://media.webuildgroup.com/sites/default/files/2025-09/GERD_brochure%20ING%20-%20versione%20web_Sept%202025.pdf]
    Financing: The project was estimated at approximately US$5 billion. Reporting cited predominantly domestic public financing, bonds and contributions; the 2025 inauguration represents completion of the construction programme rather than a new external financial close. [Assessment date: 2025-12-31 | Evidence period: 9 September 2025 | Finance source(s): https://www.reuters.com/sustainability/boards-policy-regulation/ethiopia-opens-africas-largest-hydroelectric-dam-egyptian-protest-2025-09-09/ ; https://www.eep.com.et/?news=the-inauguration-of-the-grand-ethiopian-renaissance-dam-gerd-on-september-9-2025-marks-a-monumental-day-not-just-for-ethiopia-but-for-the-entire-african-continent ; https://media.webuildgroup.com/sites/default/files/2025-09/GERD_brochure%20ING%20-%20versione%20web_Sept%202025.pdf]
  • 2022 Construction planned: Data Not Available
  • 2017 Construction planned: Operation
    60% of dam construction completed.

    2014: 30% of dam constructioncompleted. 2017: 60% of damconstruction completed
    Financing: If the information for this questionis not available, Note: NotAvailable.
  • 2016 Construction
  • 2015 Construction
  • 2014 Construction
    30% of dam construction completed.
  • 2013 Construction planned: Data Not Available
  • 2012 Construction planned: Data Not Available

Key figures

Dimension Planned Achieved
Annual Hydroelectric Production 70 GWh 0 GWh
Total Installed Capacity 5,150 MW 5,150 MW

Indicators & milestones

Indicator Value
Percentage (rate ) of construction completed
60% of dam construction completed.
0 %

Key facts

Programme
Intergovernmental Authority on Development (IGAD)
Status
Active
Countries
Ethiopia, Egypt, Ethiopia, Sudan, Ethiopia
Region
East Africa
Last updated
25 Sep 2026

Financing

USD million
Preparation cost
0.00
Preparation funding gap
0.00
Capital cost (CAPEX)
0.00
CAPEX funding gap
0.00
Operation cost
0.00

Stakeholders

Common Market for Eastern and Southern Africa
COMESA
Eastern Africa Power Pool
EAPP
Ethiopian Electricity Power Cooperation
EEPCo
Nile River Basin Program
NRBIP
Inter-Governmental Authority on Development (IGAD)
IGAD

Source: African Infrastructure Database (AUDA-NEPAD)