GERD (Ethiopia)- Khartoum (Sudan)Transmission Line
GERD-Rabak
Overview
Summary
Description
Construction of a transmission line (580 km / 500 kV) that connects the power networks of Ethiopia and Sudan to facilitate trading in electricity and promote power systems stability. The interconnector will have a transmission capacity of 3000 MW.
The Project also includes two new, 500kV capacitated substations at Rabak and Jebel Aulia (both in Sudan), and power line bay extensions at the following existing substations: Grand Renaissance (500kV Ethiopia), Rabak (220kV, Sudan) and Jebel Aulia (220kV, Sudan).
Construction of a 500kV transmission line and the associated substations that connects the power networks of Ethiopia and Sudan to facilitate trading in electricity and promote power systems stability. The line will be 580 km in total, 564 km in Sudan, terminating in Khartoum, 16 km in Ethiopia, terminating at the Grand Renaissance Dam. The Project also includes two new, 500 kV capacitated substations at Rabak and Jebel Aulia (both in Sudan), and power line bay extensions at the following existing substations: Grand Renaissance (500kV Ethiopia), Rabak (220kV, Sudan) and Jebel Aulia (220kV, Sudan).
It is expected that the project would assist the two partners to obtain the following specific benefits: to promote power system stability in the countries concerned; to promote energy connectivity among the countries by assisting them to integrate their respective networks and thereby develop ability for building larger power projects to meet larger regional markets; to develop ability to negotiate better terms for procurement of power equipment and technical assistance; to reduce the cost of power in both countries; in the long term, complete integration of the power systems in Egypt and Sudan; and to create productive employment and economic development across the borders. The main objectives of the project include provision of transmission capacity to cater for grid interconnection between Egypt and Sudan, provision of transmission infrastructure to cater for future grid interconnections to other countries, promotion of regional cooperation through sharing of power generation resources and facilitation of rural electrification and improve the standard of living for the population in project areas
Objectives
It is expected that the project would assist the two partners to obtain the following specific benefits:
- to promote power system stability in the countries concerned;
- to promote energy connectivity among the countries by assisting them to integrate their respective networks and thereby develop ability for building larger power projects to meet larger regional markets;
- to develop ability to negotiate better terms for procurement of power equipment and technical assistance;
- to reduce the cost of power in both countries;
- in the long term, complete integration of the power systems in Egypt and Sudan; and
- to create productive employment and economic development across the borders.
The main objectives of the project include provision of transmission capacity to cater for grid interconnection between Egypt and Sudan, provision of transmission infrastructure to cater for future grid interconnections to other countries, promotion of regional cooperation through sharing of power generation resources and facilitation of rural electrification and improve the standard of living for the population in project areas.
Economics
CAPEX last updated in 2006. Project economics and finances reflected here also refers also to "E.02.02.02 Ethiopia-Sudan Transmission Interconnector (Sudan section)".
A sensitivity analysis was undertaken as part of the Feasibility Study which quantified the impact on the Ethiopian section of an increase in interest rates and quantified the impact of construction delays, cost overruns and mezzanine debt on the Sudanese section. The sensitivity analysis concluded that a 4% increase in interest rates on the senior debt would result in the Ethiopian equity payback period increasing from 17 years to 29 years
Risks
- Environmental Risk: Potential impact during the construction and operational phases relating to biodiversity and ecosystems (including avifauna), material use as it impacts on soil and groundwater recharge as well as solid waste and wastewater pollution impact on water bodies
- Socio-economic Risk: Potential impact during the construction and operational phases relating to quality of air and dust emissions, noise and other nuisance as well as the impact on tourism and cultural heritage due to visual and aesthetic impacts. Resettlement necessary for project-affected communities. Furthermore, possible adverse community health and safety effects from electromagnetic fields.
- Construction Risk: A comprehensive set of risks have been identified, including potential degradation and damage of the existing structures including any archaeological materials and terrain due to excavation,
- Operation Risk: Collision of birds with conductors, permanent interference between the project and local habitats as well as air emissions from maintenance equipment.
The Feasibility Study highlights two sets of project-related risks in the ESMP, namely construction risk and operation risk. - adverse physical and/or economic impacts, temporary or permanent displacement, as well as temporary or permanent loss of assets, facilities or access to resource such as crops, woodlots, grazing lands, wells, businesses and services, etc. Among the risks identified, the Project considered the social risk of resettlement as being particularly serious
Progress history
-
2025
Project Structuring planned: Data Not Available
No construction or energisation milestone for the separate 500 kV line was confirmed in 2025. Route definition, procurement arrangements and project financing remain the principal steps before implementation. [Progress source(s): https://www.eep.com.et/?news=the-inauguration-of-the-grand-ethiopian-renaissance-dam-gerd-on-september-9-2025-marks-a-monumental-day-not-just-for-ethiopia-but-for-the-entire-african-continent]Financing: No current financing close specific to this exact line was verified; remove vague claims not tied to a named financier.
-
2024
Project Structuring planned: Data Not Available
Financing: World Bank suspend funding due to Political Reasons in Sudan
- 2022 Feasibility planned: Data Not Available
- 2021 Feasibility planned: Data Not Available
-
2017
Project Structuring planned: Tendering
Final joint feasibility meeting held in Sudan in January 2017
Final tender document for transmission and substation report complete in January 2017
Activities in the pipeline:
• Update financial model, including affordability assessment by the utilities
• Market soundings with DFIs and institutional investors
• RFQ/ RFP process to appoint EPC contractor
• Negotiations with lenders and possible funding applications.
2013: The first transmission interconnector project between Ethiopia and Sudan was commissioned in December 2013. 2015: The two national power utilities, namely EEP and SETCO, commissioned a feasibility study in July 2015, which was managed by a Joint Technical Committee (JTC). 2016: • Joint data validation, load forecasting and network analysis meeting held in Sudan and project inception meeting held in February 2016; • Joint power system analysis and expansion planning seminar held in Ethiopia in April 2016; • Final feasibility study report as well as the joint economic, financial and risk analysis meeting held in Sudan in October 2016; • Final ESIA, Resettlement Action Plan and Environmental and Social Management Plan completed in December 2016; • Final Transmission and Substation Engineering Design Report completed in December 2016; • Joint tender documents and procurement workshop held in Ethiopia in December 2016. 2017: Final joint feasibility meeting held in Sudan in January 2017 Final tender document for transmission and substation report complete in January 2017 Activities in the pipeline: • Update financial model, including affordability assessment by the utilities • Market soundings with DFIs and institutional investors • RFQ/ RFP process to appoint EPC contractor • Negotiations with lenders and possible funding applications. 2020: Update financial model, including affordability assessment by the utilities; Market soundings with DFIs and institutional investors; RFQ/ RFP process to appoint EPC contractor; Negotiations with lenders and possible funding applications. (IGAD Regional Infrastructure Masterplan: Volume 1, 2020)Financing: The Project Information Memorandum published November 2017 specifies a CAPEX of USD 14 mil, excl. VAT so this should be factored into the CAPEX in the financing tab, i.e. USD 15.96 mil. Existing information already specifies a CAPEX amount. -
2016
Data Not Available planned: Transaction Support & Financial Close
• Joint data validation, load forecasting and network analysis meeting held in Sudan and project inception meeting held in February 2016;
• Joint power system analysis and expansion planning seminar held in Ethiopia in April 2016;
• Final feasibility study report as well as the joint economic, financial and risk analysis meeting held in Sudan in October 2016;
• Final ESIA, Resettlement Action Plan and Environmental and Social Management Plan completed in December 2016;
• Final Transmission and Substation Engineering Design Report completed in December 2016;
• Joint tender documents and procurement workshop held in Ethiopia in December 2016. -
2015
Data Not Available planned: Project Structuring
The two national power utilities, namely EEP and SETCO, commissioned a feasibility study in July 2015, which was managed by a Joint Technical Committee (JTC).
- 2014 Data Not Available planned: Feasibility
-
2013
Pre-Feasibility planned: Data Not Available
The first transmission interconnector project between Ethiopia and Sudan was commissioned in December 2013.
- 2012 Pre-Feasibility planned: Data Not Available
Key figures
| Dimension | Planned | Achieved |
|---|---|---|
| Length | 580 m | 0 m |
| Total Installed Capacity | 3,000 MW | 0 MW |
| Voltage | 500 kV | 0 kV |
Key facts
- Programme
- Intergovernmental Authority on Development (IGAD)
- Status
- Stall
- Countries
- Ethiopia, Ethiopia, Sudan, Ethiopia, Sudan
- Region
- East Africa
- Location
- 15.597, 32.536
- Last updated
- 25 Sep 2026
Financing
USD million- Preparation cost
- 186.00
- Preparation funding gap
- 0.00
- Capital cost (CAPEX)
- 29.00
- CAPEX funding gap
- 0.00
- Operation cost
- 29.00
- Total cost
- 29,320,486.00
Stakeholders
- Common Market for Eastern and Southern Africa
- COMESA
- Eastern Africa Power Pool
- EAPP
- Eastern Nile Technical Regional Office - ENTRO
- ENTRO
- Ethiopia - Government of Ethiopia
- GoET
- Ethiopian Electricity Power Cooperation
- EEPCo
- Ethiopian Minister of Water, Irrigation and Electricity
- MOWIE
- Inter-Governmental Authority on Development (IGAD)
- IGAD
- Nile River Basin Program
- NRBIP
- Sudan - Government of Sudan
- GoSD