Mugomba Hydropower Project

Energy Hydro Power Plant

Overview

Summary

The project is for development of hydropower scheme of 40MW in Eastern DRC. This 40 MW site is located on the Luholu River in the Lubero district, approximately on the equator, and North-east from Lubero. This site would be convenient to supply the Bukavu-Goma-Beni transmission line. In the ONRD 1972 study, the site ranked second best after Sisi on the Ruzizi River. Given the medium size and convenient location, as well as being potentially economic, this site was recommended for further evaluation. The project was at reconnaissance phase.

The estimated cost is US$87.6millions

Description

The project is for development of hydropower scheme of 40MW in Eastern DRC. This 40 MW site is located on the Luholu River in the Lubero district, approximately on the equator, and North-east from Lubero. This site would be convenient to supply the Bukavu-Goma-Beni transmission line. In the ONRD 1972 study, the site ranked second best after Sisi on the Ruzizi River. Given the medium size and convenient location, as well as being potentially economic, this site was recommended for further evaluation. The project was at reconnaissance phase.

The estimated cost is US$87.6millions


Progress history

  • 2022 Project Definition planned: Feasibility

Key facts

Status
Active
Countries
Democratic Republic of Congo, Democratic Republic of Congo
Last updated
22 Apr 2022

Financing

USD million
Preparation cost
0.00
Preparation funding gap
0.00
Capital cost (CAPEX)
87.60
CAPEX funding gap
0.00
Operation cost
0.00

Stakeholders

Nile River Basin Program
NRBIP
DRC - Government of Democratic Republic of Congo
GoCD

Source: African Infrastructure Database (AUDA-NEPAD)