ZTK Transmission Interconnector (Tanzania Section: Iringa-Shinyanga
Overview
Summary
The objective of the ZTK Interconnector is to facilitate trading in electricity in the region and promote power systems stability. ZTK will effectively connect the Southern African Power Pool (SAPP) with the East African Power Pool (EAPP). Its benefits are multifaceted as it will simultaneously connect Tanzania to the East Africa Power Pool and Southern African Power Pool for the first time. By interconnecting the EAPP and SAPP grids, it will create the largest power pool on the continent and will be an essential component of the North-South (Cape to Cairo) power transmission corridor
Description
The objective of the ZTK Interconnector is to facilitate trading in electricity in the region and promote power systems stability. ZTK will effectively connect the Southern African Power Pool (SAPP) with the East African Power Pool (EAPP). Its benefits are multifaceted as it will simultaneously connect Tanzania to the East Africa Power Pool and Southern African Power Pool for the first time. By interconnecting the EAPP and SAPP grids, it will create the largest power pool on the continent and will be an essential component of the North-South (Cape to Cairo) power transmission corridor
Progress history
- 2022 Construction planned: Operation
Key facts
- Status
- Active
- Countries
- Tanzania, Zambia, Tanzania, Zambia
- Last updated
- 22 Apr 2022
Financing
USD million- Preparation cost
- 0.00
- Preparation funding gap
- 0.00
- Capital cost (CAPEX)
- 242.00
- CAPEX funding gap
- 0.00
- Operation cost
- 0.00