South Sudan (Juba)- South Sudan (Bor) Power Transmission line

Energy Power Interconnector

Overview

Summary

Located between the city of Juba and Bor. Implementation of a transmission line from Juba to Bor. This is a step for the transmission line from Juba to Malakal, which aim is to transfer energy from the south (hydropower production and interconnection with Uganda, Kenya and Ethiopia) to the north of South Sudan (interconnection with Sudan and Ethiopia) and develop National grid. 400/500 kV of a length of 151 km.

 

Construction of approximately 500 km of 400 kV transmission line. This line emanates from Malakal substation, passes through Ayod and Bor in Jonglei state, Juba the capital of Central Equatoria state. This will involve installation of 45 MVA, 400/33 KV substation at Ayod; 60 MVA, 400/33 KV substation at Bor; 90 MVA, 400/220 kV substation on the Eastern part of Juba; 90 MVA, 220/132 kV substation on the Eastern part of Juba; 3 x 400 kV double busbar in each substation; 2 x 220 kV bays; 1 x 132 kV bay.

 

 

USD 108 Million for the Malakal-Ayod-Bor-Juba Transmission line.

Description

Located between the city of Juba and Bor. Implementation of a transmission line from Juba to Bor. This is a step for the transmission line from Juba to Malakal, which aim is to transfer energy from the south (hydropower production and interconnection with Uganda, Kenya and Ethiopia) to the north of South Sudan (interconnection with Sudan and Ethiopia) and develop National grid. 400/500 kV of a length of 151 km.

 

Construction of approximately 500 km of 400 kV transmission line. This line emanates from Malakal substation, passes through Ayod and Bor in Jonglei state, Juba the capital of Central Equatoria state. This will involve installation of 45 MVA, 400/33 KV substation at Ayod; 60 MVA, 400/33 KV substation at Bor; 90 MVA, 400/220 kV substation on the Eastern part of Juba; 90 MVA, 220/132 kV substation on the Eastern part of Juba; 3 x 400 kV double busbar in each substation; 2 x 220 kV bays; 1 x 132 kV bay.

 

 

USD 108 Million for the Malakal-Ayod-Bor-Juba Transmission line.

Progress history

  • 2022 Project Definition planned: Feasibility

Key facts

Status
Active
Countries
South Sudan, Sudan, South Sudan, Sudan
Last updated
22 Apr 2022

Financing

USD million
Preparation cost
3.00
Preparation funding gap
0.00
Capital cost (CAPEX)
108.00
CAPEX funding gap
108.00
Operation cost
0.00

Stakeholders

Nile River Basin Program
NRBIP
Government of South Sudan
GoSS
Government of South Sudan
GoSS

Source: African Infrastructure Database (AUDA-NEPAD)