Located between the city of Bor and Malakal. Implementation of a transmission line from Bor to Malakal. This is a step for the transmission line from Juba to Malakal, which aim is to transfer energy from the south (hydropower production and interconnection with Uganda, Kenya and Ethiopia) to the north of South Sudan (interconnection with Sudan and Ethiopia) and develop National grid. 400/500 kV of length of 366km

Estimated cost is USD 108 million.

Description

Located between the city of Bor and Malakal. Implementation of a transmission line from Bor to Malakal. This is a step for the transmission line from Juba to Malakal, which aim is to transfer energy from the south (hydropower production and interconnection with Uganda, Kenya and Ethiopia) to the north of South Sudan (interconnection with Sudan and Ethiopia) and develop National grid. 400/500 kV of length of 366km

Estimated cost is USD 108 million.

Objectives

Power interconnection

Progress history

  • 2022 Project Definition planned: Feasibility

Key facts

Status
Active
Countries
South Sudan, South Sudan
Last updated
22 Apr 2022

Financing

USD million
Preparation cost
0.00
Preparation funding gap
0.00
Capital cost (CAPEX)
108.00
CAPEX funding gap
0.00
Operation cost
0.00