Goma-Buhandahanda Power Interconnection within the Democratic Republic of Congo (DRC).
Energy Power Interconnector
Overview
Summary
This is a 95 km Overhead Transmission Line (OHTL) at 220kV within the D.R Congo and interconnects with Ruzizi III (Kamanyola-Buhandahanda line). The Goma-Buhandahanda power interconnection is a 95 km 220kV Overhead Transmission Line (OHTL) within the D.R Congo and interconnects with Ruzizi III (Kamanyola-Buhandahanda line). The Goma - Buhandahanda interconnection is financed by the African Development Bank (AfDB) and coordinated by NELSAP-CU on behalf of the D.R Congo. The project is ongoing and work done has reached 20%.
Description
This is a 95 km Overhead Transmission Line (OHTL) at 220kV within the D.R Congo and interconnects with Ruzizi III (Kamanyola-Buhandahanda line). The Goma-Buhandahanda power interconnection is a 95 km 220kV Overhead Transmission Line (OHTL) within the D.R Congo and interconnects with Ruzizi III (Kamanyola-Buhandahanda line). The Goma - Buhandahanda interconnection is financed by the African Development Bank (AfDB) and coordinated by NELSAP-CU on behalf of the D.R Congo. The project is ongoing and work done has reached 20%.
Objectives
95 km Overhead Transmission Line (OHTL) at 220kV within the D.R Congo and interconnects with Ruzizi III (Kamanyola-Buhandahanda line)
Progress history
- 2022 Construction
Key figures
| Dimension | Planned | Achieved |
|---|---|---|
| Voltage | 220 kV | 0 kV |
Key facts
- Status
- Active
- Countries
- Democratic Republic of Congo, Democratic Republic of Congo, Democratic Republic of Congo
- Last updated
- 22 Apr 2022
Financing
USD million- Preparation cost
- 0.00
- Preparation funding gap
- 0.00
- Capital cost (CAPEX)
- 0.00
- CAPEX funding gap
- 0.00
- Operation cost
- 0.00
Stakeholders
- Nile River Basin Program
- NRBIP
- DRC - Government of Democratic Republic of Congo
- GoCD