← Back to all projects

Rwimi Irrigation development and watershed management (Bunyangabu)

Water Agricultural irrigation and drainage

Overview

Summary

The Rwimi Irrigation Project was identified under the LEAF II Project and has been taken over by the Directorate of Water Development under the water for production department. The project is located near Rwimi Township in Bunyangabu District, western Uganda. It draws its name from Rwimi river flowing through the area drains into the Katonga River. Elevation differences within the focal area are substantial. The river valley descends from North to South from 1290 m to 1120 m. In the Northern and Eastern part of the area the slopes ascend rather steep from the river valley. The area south of the stream is more flat. Slopes in the NorthEast range between 20-25%. Slopes in the Southern part of the area are moderately, and stay mainly under 10%. The scheme involved the development of 4,000 ha of irrigation land. Feasibility studies and design of bulk water systems and irrigation schemes of Rwimi, in the Districts of Kasese/Bunyangabu, are at 50% progress (Draft Feasibility report submitted and reviewed)

Description

The Rwimi Irrigation Project was identified under the LEAF II Project and has been taken over by the Directorate of Water Development under the water for production department. The project is located near Rwimi Township in Bunyangabu District, western Uganda. It draws its name from Rwimi river flowing through the area drains into the Katonga River. Elevation differences within the focal area are substantial. The river valley descends from North to South from 1290 m to 1120 m. In the Northern and Eastern part of the area the slopes ascend rather steep from the river valley. The area south of the stream is more flat. Slopes in the NorthEast range between 20-25%. Slopes in the Southern part of the area are moderately, and stay mainly under 10%. The scheme will involve the development of 4,000 ha of irrigation land. Feasibility studies and design of bulk water systems and irrigation schemes of Rwimi, in the Districts of Kasese/Bunyangabu, are at 50% progress (Draft Feasibility report submitted and reviewed)

Objectives

Development of 4000ha of irrigation land

Progress history

  • 2022 Project Definition planned: Feasibility

Key facts

Status
Active
Last updated
22 Apr 2022

Financing

USD million
Preparation cost
0.00
Preparation funding gap
0.00
Capital cost (CAPEX)
0.00
CAPEX funding gap
0.00
Operation cost
0.00

Stakeholders

Nile River Basin Program
NRBIP
Uganda - Government of Uganda
GoUG

Source: African Infrastructure Database (AUDA-NEPAD)