← Back to all projects

Kakono Hydropower Project

Energy Hydro Power Plant

Overview

Summary

st1\:*{behavior:url(#ieooui) } /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-parent:""; mso-padding-alt:0in 5.4pt 0in 5.4pt; mso-para-margin-top:0in; mso-para-margin-right:0in; mso-para-margin-bottom:10.0pt; mso-para-margin-left:0in; line-height:115%; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri",sans-serif; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;}

Kakono Dam is the furthest downstream potential hydropower site on the Kagera River which offers multi-purpose development opportunities to the West Lake Region of Tanzania·A Run-of the River technology incorporated within Embankment Dam with an annual mean flow of 243m3/sec, installed capacity of 87MW and mean annual energy production of 573Gwh


Description

Objectives

àRun-of the River technology incorporated within Embankment Dam with an annual mean flow of 243m3/sec, installed capacity of 87MW and mean annual energy production of 573Gwh

Construction of a new 38.5km, 132kV Transmission Line from the Dam site, Kakono to Kyaka substation and rehabilitation works at the existing 132/33kV substation at Kyaka.

Progress history

  • 2022 Pre-Feasibility planned: Feasibility

Key figures

Dimension Planned Achieved
Annual Hydroelectric Production 573 GWh 0 GWh
Power 87 MW 0 MW

Key facts

Status
Active
Last updated
22 Apr 2022

Financing

USD million
Preparation cost
0.00
Preparation funding gap
0.00
Capital cost (CAPEX)
96.00
CAPEX funding gap
96.00
Operation cost
0.00

Stakeholders

Nile River Basin Program
NRBIP
Tanzania - Government of Tanzania
GoTZ
Tanzania Electricity Supply Company
TANESCO

Source: African Infrastructure Database (AUDA-NEPAD)