Lakki HPP is located on the Bar El Jebel River approximately 72 km downstream of Nimule and will consist of a powerhouse located on  

Reservoir MOL 519 m. The Full Storage 32 hm3 and Live Storage 8.5 hm3. Total Installed Capacity 300 MW (6 x 50 MW) with Firm Energy 744 GWh and Average Energy 1 181 GWh.

Progress history

  • 2020 Project Definition planned: Feasibility

Key figures

Dimension Planned Achieved
Number of Units 6 units 0 units
Power 300 MW 0 MW
Voltage 220 kV 0 kV

Key facts

Status
Active
Last updated
21 Apr 2022

Financing

USD million
Preparation cost
6.00
Preparation funding gap
0.00
Capital cost (CAPEX)
0.00
CAPEX funding gap
0.00
Operation cost
0.00

Stakeholders

Nile River Basin Program
NRBIP
Government of South Sudan
GoSS