Semuliki Hydropower Project
Overview
Summary
Semliki River is part of the Nile River Basin with two thirds of its course being in the DRC and the lower third forming the boundary between the DRC and Uganda. Great Lakes Region is characterized by a shortage of indigenous energy sources and highly skewed relationships of dependency regarding energy imports Less than 10% of the population has access to electricity. The region is thus heavily dependent on oil imports Currently, majority of the population of Eastern DRC, Rwanda, Burundi and Uganda relies on bio-fuels such as wood The power demand for the cities of Beni, Butembo and surroundings will be supplied from a hydropower station on the Semliki River with a capacity of 72 MW. It will need a step-up transformer MV/HV or MV; including the construction of the distribution network. The Semliki hydropower station would serve mainly the towns of BA©ni and Butembo as well as the rural areas located around these towns. The available reserve could be exported to the Great Lakes Region with an interconnection grid.
A hydropower station of 72 MW; - Power distribution network low and high voltage in the towns of Beni and Butembo and surroundings. The distribution network is envisaged to be a Medium Voltage network. BA©ni and Butembo will be served by 30 kV lines from the substation at the Semliki plant.
Butembo has already a network LV and MV linked to its own hydropower station. However its network will be adapted to the parameters of the Semliki project (distribution voltage 30 kV, distribution 6.6 kV) and will in some cases be extended. A high voltage transmission line (220kV) from Goma - Butembo - BA©ni whose feasibility is complete will also be constructed to evacuate the generation from Semuliki
Description
Semliki River is part of the Nile River Basin with two thirds of its course being in the DRC and the lower third forming the boundary between the DRC and Uganda. Great Lakes Region is characterized by a shortage of indigenous energy sources and highly skewed relationships of dependency regarding energy imports Less than 10% of the population has access to electricity. The region is thus heavily dependent on oil imports Currently, majority of the population of Eastern DRC, Rwanda, Burundi and Uganda relies on bio-fuels such as wood The power demand for the cities of Beni, Butembo and surroundings will be supplied from a hydropower station on the Semliki River with a capacity of 72 MW. It will need a step-up transformer MV/HV or MV; including the construction of the distribution network. The Semliki hydropower station would serve mainly the towns of Béni and Butembo as well as the rural areas located around these towns. The available reserve could be exported to the Great Lakes Region with an interconnection grid.
A hydropower station of 72 MW; - Power distribution network low and high voltage in the towns of Beni and Butembo and surroundings. The distribution network is envisaged to be a Medium Voltage network. Béni and Butembo will be served by 30 kV lines from the substation at the Semliki plant.
Butembo has already a network LV and MV linked to its own hydropower station. However its network will be adapted to the parameters of the Semliki project (distribution voltage 30 kV, distribution 6.6 kV) and will in some cases be extended. A high voltage transmission line (220kV) from Goma - Butembo - Béni whose feasibility is complete will also be constructed to evacuate the generation from Semuliki
Objectives
station of 72 MW; - Power distribution network low and high voltage in the
towns of Beni and Butembo and surroundings. The distribution network is
envisaged to be a Medium Voltage network. Béni and Butembo will be served by 30
kV lines from the substation at the Semliki plant.
Progress history
- 2020 Pre-Feasibility planned: Feasibility
Key facts
- Status
- Active
- Countries
- Democratic Republic of Congo, Uganda, Democratic Republic of Congo, Uganda
- Last updated
- 21 Apr 2022
Financing
USD million- Preparation cost
- 6.00
- Preparation funding gap
- 0.00
- Capital cost (CAPEX)
- 0.00
- CAPEX funding gap
- 0.00
- Operation cost
- 0.00
Stakeholders
- Nile River Basin Program
- NRBIP
- Uganda - Government of Uganda
- GoUG
- DRC - Government of Democratic Republic of Congo
- GoCD