Nyimur/Limur multipurpose water resources project
Overview
Summary
The Nyimur/Limur multipurpose water resources project is a transboundary project located in the Aswa Basin covering parts of Lamwo District, Uganda and Magwi Country, Eastern Equatorial State, South Sudan. The project comprises of several components including a community-based irrigation scheme, a dam and water reservoir, a water and soil conservation component and flood control component. The core scheme of the project consists of a 26 m head dam on the Nyimur River, a mini hydropower plant with a 350 kW capacity; and development of 5,105 ha for paddy rice irrigation. The project is expected to benefit 12,000 people from the two countries.
The preparatory studies (2015-2019) included feasibility studies for community-based irrigation, hydropower generation, and watershed management; an Environmental and Social Impact Assessment (ESIA); and preparation of a Resettlement Action Plan (RAP). At the project end in 2019, a roundtable donors meeting was held to mobilize resources for the implementation phase.
Description
Nyimur/Limur multipurpose water resources project is a transboundary project located in the Aswa Basin covering parts of Lamwo District, Uganda and Magwi Country, Eastern Equatorial State, South Sudan. The project comprises of several components including a community-based irrigation scheme, a dam and water reservoir, a water and soil conservation component and flood control component. The core scheme of the project consists of a 26 m head dam on the Nyimur River, a mini hydropower plant with a 350 kW capacity; and development of 5,105 ha for paddy rice irrigation. The project is expected to benefit 12,000 people from the two countries.
The preparatory studies (2015-2019) included feasibility studies for community-based irrigation, hydropower generation, and watershed management; an Environmental and Social Impact Assessment (ESIA); and preparation of a Resettlement Action Plan (RAP). At the project end in 2019, a roundtable donors meeting was held to mobilize resources for the implementation phase.
The location coordinates are 3.560042°N, 32.361010°E
Progress history
- 2020 Feasibility planned: Project Structuring
Key facts
- Status
- Active
- Countries
- South Sudan, Uganda, South Sudan, Uganda, South Sudan, Uganda
- Last updated
- 21 Apr 2022
Financing
USD million- Preparation cost
- 2.00
- Preparation funding gap
- 0.00
- Capital cost (CAPEX)
- 110.00
- CAPEX funding gap
- 0.00
- Operation cost
- 0.00
Stakeholders
- Nile River Basin Program
- NRBIP
- Government of South Sudan
- GoSS
- Uganda - Government of Uganda
- GoUG