Nyimur/Limur multipurpose water resources project

Water Multi-purpose Reservoir

Overview

Summary

The Nyimur/Limur multipurpose water resources project is a transboundary project located in the Aswa Basin covering parts of Lamwo District, Uganda and Magwi Country, Eastern Equatorial State, South Sudan. The project comprises of several components including a community-based irrigation scheme, a dam and water reservoir, a water and soil conservation component and flood control component. The core scheme of the project consists of a 26 m head dam on the Nyimur River, a mini hydropower plant with a 350 kW capacity; and development of 5,105 ha for paddy rice irrigation. The project is expected to benefit 12,000 people from the two countries.

The preparatory studies (2015-2019) included feasibility studies for community-based irrigation, hydropower generation, and watershed management; an Environmental and Social Impact Assessment (ESIA); and preparation of a Resettlement Action Plan (RAP). At the project end in 2019, a roundtable donors meeting was held to mobilize resources for the implementation phase.


 The location coordinates are 3.560042°N, 32.361010°E

Description

Nyimur/Limur multipurpose water resources project is a transboundary project located in the Aswa Basin covering parts of Lamwo District, Uganda and Magwi Country, Eastern Equatorial State, South Sudan. The project comprises of several components including a community-based irrigation scheme, a dam and water reservoir, a water and soil conservation component and flood control component. The core scheme of the project consists of a 26 m head dam on the Nyimur River, a mini hydropower plant with a 350 kW capacity; and development of 5,105 ha for paddy rice irrigation. The project is expected to benefit 12,000 people from the two countries.

 

The preparatory studies (2015-2019) included feasibility studies for community-based irrigation, hydropower generation, and watershed management; an Environmental and Social Impact Assessment (ESIA); and preparation of a Resettlement Action Plan (RAP). At the project end in 2019, a roundtable donors meeting was held to mobilize resources for the implementation phase.

 The location coordinates are 3.560042°N, 32.361010°E

Progress history

  • 2020 Feasibility planned: Project Structuring

Key facts

Status
Active
Countries
South Sudan, Uganda, South Sudan, Uganda, South Sudan, Uganda
Last updated
21 Apr 2022

Financing

USD million
Preparation cost
2.00
Preparation funding gap
0.00
Capital cost (CAPEX)
110.00
CAPEX funding gap
0.00
Operation cost
0.00

Stakeholders

Nile River Basin Program
NRBIP
Government of South Sudan
GoSS
Uganda - Government of Uganda
GoUG