← Back to all projects

Bahr El Arab/Bahr El Ghazal Basin Management and Development Project

Water River Basin Management

Overview

Summary

The Bahr El Arab/Bahr El Ghazal Basin Management and Development Project is shared project between Sudan and South Sudan for the joint management and development of the Bahr El Ghazal Sub-basin which consists of a number of tributaries that run from the border of the Congo Basin to the Nile. The sub-basin is shared by Sudan and South Sudan. The peak of rainfall in the southwestern part produces over 1,550mm of average annual rainfall, which decreases toward the northeast where the annual precipitation does not exceed 500 mm. The average annual precipitation over the entire area is 826 mm and the average annual potential evapotranspiration over the sub-basin is 1,807 mm. The sub-basin is divided into many tributaries with bank overflow and flooding. In this large area of very low slope, nearly all the basin runoff and precipitation evaporates. This large drainage area can be divided into three land classes namely the land containing the upper courses of the Ghazal tributaries, the swampy land on the lower course of the tributaries, and the land north of the Bahr el Arab.


Description

The Bahr El Arab/Bahr El Ghazal Basin Management and Development Project is shared project between Sudan and South Sudan for the joint management and development of the Bahr El Ghazal Sub-basin which consists of a number of tributaries that run from the border of the Congo Basin to the Nile. The sub-basin is shared by Sudan and South Sudan. The peak of rainfall in the southwestern part produces over 1,550mm of average annual rainfall, which decreases toward the northeast where the annual precipitation does not exceed 500 mm. The average annual precipitation over the entire area is 826 mm and the average annual potential evapotranspiration over the sub-basin is 1,807 mm. The sub-basin is divided into many tributaries with bank overflow and flooding. In this large area of very low slope, nearly all the basin runoff and precipitation evaporates. This large drainage area can be divided into three land classes namely the land containing the upper courses of the Ghazal tributaries, the swampy land on the lower course of the tributaries, and the land north of the Bahr el Arab.


Progress history

  • 2022 Project Definition planned: Feasibility

Key facts

Status
Active
Countries
South Sudan, Sudan, South Sudan, Sudan, South Sudan, Sudan
Last updated
21 Apr 2022

Financing

USD million
Preparation cost
0.00
Preparation funding gap
0.00
Capital cost (CAPEX)
10.00
CAPEX funding gap
0.00
Operation cost
0.00

Stakeholders

Nile River Basin Program
NRBIP
Government of South Sudan
GoSS
Sudan - Government of Sudan
GoSD

Source: African Infrastructure Database (AUDA-NEPAD)