The Fulla Rapids Project

Water Multi-purpose Reservoir

Overview

Summary

The most upstream dam on the Bahr el-Jebel is Fula Rapids, located in Magwi County. The dam is located in the Nimule National Park (on the left

Description

The Fula Rapids HPP is located 6 km downstream of Nimule at an area of the Bahr El Jebel River characterized by a steep gradient and narrow valley. The project will be located on the East bank of the river and will feature a 400 m long channel, a penstock, powerhouse and an outlet/spillway structure.

Fula 1- spillway will be controlled by eleven (11) 6.5 m wide radial gates of 10 m height. The full dam will be constructed in concrete and will be 760 m in length. Physical Features Summary Gross / Rated / Minimum 49 m / 44.6 m / Unknown Number of Units 9 Design Discharge 1 213 m3 /s Reservoir FSL 596 m Reservoir MOL 591 m Full Storage 281 hm3 Live Storage 79.4 hm3

Project costs (excl. Transmission Lines) 1 244.95 US$ M

Objectives

Development of multipurpose dam for hdyropower development of 855MW and irrigation development of 2,700ha.

Progress history

  • 2022 Feasibility planned: Project Definition

Key figures

Dimension Planned Achieved
Area equipped for irrigation (ha) 2 ha 0 ha
Direct Beneficiaries - irrigation 70 persons 0 persons
Power 855 MW 0 MW

Key facts

Status
Active
Countries
South Sudan, South Sudan, South Sudan
Last updated
21 Apr 2022

Financing

USD million
Preparation cost
0.00
Preparation funding gap
0.00
Capital cost (CAPEX)
1,244.95
CAPEX funding gap
0.00
Operation cost
0.00

Stakeholders

Nile River Basin Program
NRBIP
Government of South Sudan
GoSS

Source: African Infrastructure Database (AUDA-NEPAD)