Mandaya Hydropower Project
Overview
Summary
The Mandaya Hydropower Project site is located on the Blue Nile (Abbay River) in Ethiopia some 20 km downstream of the confluence of the Abay and Didessa Rivers. The project comprises of a 200 m high roller compacted concrete dam with 1400 m long crest and 2000 MW installed generation capacity. The dam will create a reservoir of surface area 736 km2 and 49,200 MCM storage capacity. The project also involves the construction of an access road linking the Mandaya site to the Addis Ababa to Asosa road. The catchment area upstream of the site is 128,729 km2.
Prefeasibility studies were completed in 2007 with grant funding from the African Development Bank under the Easer Nile Power Trade Program.
Description
The Mandaya Hydropower Project site is located on the Blue Nile (Abbay River) in Ethiopia some 20 km downstream of the confluence of the Abay and Didessa Rivers. The project comprises of a 200 m high roller compacted concrete dam with 1400 m long crest and 2000 MW installed generation capacity. The dam will create a reservoir of surface area 736 km2 and 49,200 MCM storage capacity. The project also involves the construction of an access road linking the Mandaya site to the Addis Ababa to Asosa road. The catchment area upstream of the site is 128,729 km2.
Prefeasibility studies were completed in 2007 with grant funding from the African Development Bank under the Easer Nile Power Trade Program.
Progress history
- 2024 Pre-Feasibility planned: Feasibility
- 2022 Pre-Feasibility planned: Feasibility
Key facts
- Programme
- Eastern Nile Technical Regional Office (ENTRO)
- Status
- Active
- Countries
- Ethiopia, Ethiopia, Ethiopia
- Last updated
- 25 Sep 2026
Financing
USD million- Preparation cost
- 0.00
- Preparation funding gap
- 0.00
- Capital cost (CAPEX)
- 2,472.00
- CAPEX funding gap
- 2,472.00
- Operation cost
- 0.00
Stakeholders
- Nile River Basin Program
- NRBIP
- Ethiopia - Government of Ethiopia
- GoET
- Eastern Nile Technical Regional Office - ENTRO
- ENTRO