The Transboundary Akanyaru Multipurpose Water Resources Project (between Burundi and Rwanda)

Akanyaru

BIP_NELSAP_009 Water Multi-purpose Reservoir

Overview

Summary

Akanyaru MPP (Burundi/Rwanda) consists of a 334 Mm3 dam, 12,400 ha of irrigated land, 14.5 MW electricity, potable water supply for 683,585 people and restoration of 1700km2 degraded watersheds. It is anticipated that the project would improve the living conditions and incomes of rural populations in the provinces of Kirundo, Ngozi and Kayanza in Burundi; and Huye and Gisagara Districts in Rwanda; and surrounding areas.

Description

Akanyaru MPP (Burundi/Rwanda) consists of a 334 Mm3 dam, 12,400 ha of irrigated land, 14.5 MW electricity, potable water supply for 683,585 people and restoration of 1700km2 degraded watersheds. It is anticipated that the project would improve the living conditions and incomes of rural populations in the provinces of Kirundo, Ngozi and Kayanza in Burundi; and Huye and Gisagara Districts in Rwanda; and surrounding areas. Expected direct and indirect impacts include the creation of employment opportunities, water for domestic consumption, hydro power production, agricultural production, and livestock production. The outcomes of these benefits will enhance household incomes and livelihoods, environmental protection /watershed management, agricultural production to match the ever-increasing human populations and market demand at regional level thereby improving both national and regional food & energy security, social economic development and ultimately poverty reduction.

The project was originally identified in 2012 by the NELSAP-CU together with the Government of Burundi and Rwanda. The project is a high national priority for both countries. Full feasibility, detailed design and preparation of tender documents, as well as independent ESIA and RAP studies are planned to be undertaken through the NEPAD-IPPF, financed by the African Development Bank (AfDB) after the countries sign a joint MoU for the studies preparation and implementation. NEPAD-IPPF also requested the countries to choose the option of doing the feasibility, ESIA and RAP studies first because the available funds are enough to cover this activity and later seek for more funds to undertake the detailed designs and tender documents preparation.

The estimated cost of project implementation from the pre-feasibility study is USD 191m, however this number should be confirmed during the project design phase.

Objectives

The objective of the Akanyaru Multipurpose Water Resources Development Project is to harness the water resources of the transboundary Akanyaru River (shared by Rwanda and Burundi) for multiple purposes that enhance socio-economic development and regional cooperation. Specifically, the project aims to:
• Improve water supply: Provide safe drinking water to approximately 614,200 people.
• Boost agricultural productivity: Irrigate about 12,474 hectares, directly benefiting nearly 24,948 farmers.
• Generate renewable energy: Produce 14.5 MW of hydropower, powering around 141,111 homes and serving about 846,000 people.
• Enhance climate resilience: Reduce flood risks and improve water storage capacity through a dam with 333 million cubic metres of storage.
• Restore ecosystems: Support watershed restoration upstream of the dam to combat land degradation and improve sustainability.
• Strengthen regional integration: Promote cooperation between Rwanda and Burundi in managing shared water resources within the Kagera River Basin.

Progress history

  • 2020 Feasibility
  • 2012 Feasibility

Key figures

Dimension Planned Achieved
Area of watershed under improved management 170,000 ha 0 ha
Direct Beneficiaries - irrigation 639,148 persons 0 persons
Irrigation Area 12,400 km3 0 km3
Reservoir Capacity 334 km3 0 km3
Total Installed Capacity 14 MW 0 MW
Water supply capacity 614,202 m3/day 0 m3/day

Key facts

Programme
Nile Equatorial Lakes Investment Program-NEL-IP
Status
Active
Countries
Burundi, Rwanda
Last updated
24 Apr 2026

Financing

USD million
Preparation cost
3.00
Preparation funding gap
0.00
Capital cost (CAPEX)
0.00
CAPEX funding gap
191.00
Operation cost
0.00
Total cost
3.00

Stakeholders

Burundi - Government of Burundi
GoBI
Nile Equatorial Lakes Subsidiary Action Program
NELSAP
Nile River Basin Program
NRBIP
Rwanda - Government of Rwanda
GoRW