Ethiopia - Sudan Transmission Interconnector (Sudan section)
Overview
Summary
Description
This project concerns the Sudan section of a high-voltage Ethiopia-Sudan power interconnection designed to move power from Ethiopia into Sudan and strengthen the Eastern Africa Power Pool. The existing database record describes a 500 kV transmission line ending near Khartoum, with new or upgraded high-voltage substation facilities at Rabak and Jebel Aulia in Sudan and bay extensions linked to the Grand Ethiopian Renaissance area and Sudanese network nodes.
The project has an important history. Ethiopia and Sudan already implemented an earlier interconnector, which the Nile Basin Initiative documents as commissioned around 2010-2013 and used to support regional power trade. That earlier success provides a technical and institutional basis for the larger 500 kV scheme, but it does not by itself validate the very high CAPEX currently stored against this record.
Validation note: external sources confirm the strategic rationale and earlier Ethiopia-Sudan interconnection history, but I did not find a reliable external source confirming the current capex_cost value of 48,494 in USD million. The financial fields should therefore remain under owner validation before being used in investment material.
Sources reviewed: World Bank, Regional Eastern Nile - Ethiopia-Sudan Power System Interconnector Project, https://documents.worldbank.org/en/publication/documents-reports/documentdetail/935901468201843498; Nile Basin Initiative, Ethiopia-Sudan interconnection success story, https://nilebasin.org/sites/default/files/2023-09/Ethiopia-Sudan%2520interconnection%2520success%2520story.pdf.
Objectives
- Increase cross-border electricity trade between Ethiopia and Sudan.
- Improve power-system stability and reserve sharing.
- Support lower-cost electricity supply through regional hydropower and grid integration.
- Create a platform for wider Eastern Africa Power Pool interconnections.
Economics
Risks
Progress history
-
2025
Feasibility No construction or energisation milestone was confirmed for the Sudanese 500 kV section in 2025. Technical studies, route definition, procurement planning and financing remain outstanding. [Progress source(s): https://www.eep.com.et/?news=the-inauguration-of-the-grand-ethiopian-renaissance-dam-gerd-on-september-9-2025-marks-a-monumental-day-not-just-for-ethiopia-but-for-the-entire-african-continent]Financing: No current financing close specific to this exact line was verified; remove vague claims not tied to a named financier.
-
2024
Feasibility Updating of feasibility study (Delayed due to the political instability)Financing: Update of feasibility stopped due to political instability in Sudan
-
2017
Project Structuring planned: Tendering
Final joint feasibility meeting held in Sudan in January 2017
Final tender document for transmission and substation report complete in January 2017
Activities in the pipeline:
• Update financial model, including affordability assessment by the utilities
• Market soundings with DFIs and institutional investors
• RFQ/ RFP process to appoint EPC contractor
• Negotiations with lenders and possible funding applications.
2013: The first transmission interconnector project between Ethiopia and Sudan was commissioned in December 2013. 2015: The two national power utilities, namely EEP and SETCO, commissioned a feasibility study in July 2015, which was managed by a Joint Technical Committee (JTC). 2016: • Joint data validation, load forecasting and network analysis meeting held in Sudan and project inception meeting held in February 2016; • Joint power system analysis and expansion planning seminar held in Ethiopia in April 2016; • Final feasibility study report as well as the joint economic, financial and risk analysis meeting held in Sudan in October 2016; • Final ESIA, Resettlement Action Plan and Environmental and Social Management Plan completed in December 2016; • Final Transmission and Substation Engineering Design Report completed in December 2016; • Joint tender documents and procurement workshop held in Ethiopia in December 2016. 2017: Final joint feasibility meeting held in Sudan in January 2017 Final tender document for transmission and substation report complete in January 2017 Activities in the pipeline: • Update financial model, including affordability assessment by the utilities • Market soundings with DFIs and institutional investors • RFQ/ RFP process to appoint EPC contractor • Negotiations with lenders and possible funding applicationsFinancing: The Project Information Memorandum published November 2017 specifies a CAPEX of USD 422 mil, excl. VAT so this has been factored into the specified CAPEX in the financing tab, i.e. USD 481.1 mil.
The governments aim to achieve financial close for the project by January 2018. Market soundings have commenced to market the project to lenders, short list potential lenders and obtain indicative term sheets for funding. -
2016
Data Not Available planned: Transaction Support & Financial Close
• Joint data validation, load forecasting and network analysis meeting held in Sudan and project inception meeting held in February 2016;
• Joint power system analysis and expansion planning seminar held in Ethiopia in April 2016;
• Final feasibility study report as well as the joint economic, financial and risk analysis meeting held in Sudan in October 2016;
• Final ESIA, Resettlement Action Plan and Environmental and Social Management Plan completed in December 2016;
• Final Transmission and Substation Engineering Design Report completed in December 2016;
• Joint tender documents and procurement workshop held in Ethiopia in December 2016. -
2015
Data Not Available planned: Project Structuring
The two national power utilities, namely EEP and SETCO, commissioned a feasibility study in July 2015, which was managed by a Joint Technical Committee (JTC).
- 2014 Data Not Available planned: Feasibility
-
2013
Pre-Feasibility planned: Data Not Available
The first transmission interconnector project between Ethiopia and Sudan was commissioned in December 2013.
Key figures
| Dimension | Planned | Achieved |
|---|---|---|
| Power | 3,000 MW | 0 MW |
| Voltage | 500 kV | 0 kV |
Key facts
- Programme
- Intergovernmental Authority on Development (IGAD)
- Status
- Stall
- Countries
- Sudan, Ethiopia, Sudan, Ethiopia, Sudan
- Region
- East Africa
- Location
- 15.503, 32.556
- Last updated
- 25 Sep 2026
Financing
USD million- Preparation cost
- 186.00
- Preparation funding gap
- 0.00
- Capital cost (CAPEX)
- 484.00
- CAPEX funding gap
- 0.00
- Operation cost
- 29.03
- Total cost
- 699.03
Stakeholders
- Common Market for Eastern and Southern Africa
- COMESA
- Eastern Africa Power Pool
- EAPP
- Eastern Nile Technical Regional Office - ENTRO
- ENTRO
- Ethiopia - Government of Ethiopia
- GoET
- Inter-Governmental Authority on Development (IGAD)
- IGAD
- Nile River Basin Program
- NRBIP
- Sudan - Government of Sudan
- GoSD
- Sudan Ministry of Water Resources, Irrigation and Electricity
- MWRIE